Another one off the usual IT-services path: notes on earthing (grounding) a small off-grid solar system — a 12 V, 2.2 kW all-in-one inverter with roof-mounted panels and an existing set of earth rods. It covers what the wiring rules require, the neutral–earth bond that cheap inverters often leave out, where the fuses or breakers go on an unearthed battery, what an earth resistance of 28 Ω actually means, and how to measure electrodes and soil properly.
6,167 words — approximately 26 minutes reading time
I don’t expect this article to be read by anyone else but me, and it serves as my “open note”, just like the arsenic article beforehand. Nonetheless, contributions are welcome.
- 1. The system
- 2. Is an earth electrode required?
- 3. Earthing layout for this system
- 4. Battery fusing and disconnection
- 5. Terms explained
- 6. How earth electrode resistance works
- 7. Analysis of the existing system (28 Ω)
- 8. Getting below 10 Ω in dry periods
- 9. Measuring
- 10. Choosing a tester
- 11. Next steps
- References
How to read the sources
Numbers in square brackets, like [1] , link to the References section at the end. The reference list is grouped by topic, so the numbers there are not in sequence.
Standards (IEC, IEEE) are the authority but are paywalled, so they are linked to their official listing or preview pages. Manufacturer application notes and engineering articles explain the standards. Forum threads are field experience from installers and users and should be read as such, not as authority. Some sources are commercial (SPD manufacturers’ guides, e.g. [15] [39] ) or secondary study and summary sites of unclear authorship ([12] [22] [36] [40] ); they are cited where their content matches the standards and better sources, but they are the weakest references here. The battery fusing sources from Blue Sea Systems and MarineHowTo ([42] [43] ) are written for boats, where the battery negative is grounded, unlike in this system. Statements marked (engineering estimate) are calculations or common practice without a single specific source.
1. The system
| Item | Details |
|---|---|
| AC output | 230 V / 50 Hz, single-phase |
| Panels | Roof-mounted |
| Inverter | EASUN POWER 2.2 kW hybrid, 12 V battery, 80 A MPPT, PV input up to 450 V, pure sine |
| Existing earth electrodes | 7 × 2 m rods (≥ 3 m apart) + 1 × 6 m rod (~8 m from the nearest), all interconnected |
| Measured earth resistance | ~28 Ω (fall-of-potential method, measured in a very dry summer) |
2. Is an earth electrode required?
Mostly yes. For permanent installations (house, cabin, workshop), wiring codes require an earthing system:
- Europe and most of the world: the IEC 60364 series. Part 7-712 covers PV installations; its current edition (2025) also covers energy storage and points to IEC 60364-8-82 for island-mode (off-grid) operation [1] .
- US: NEC (NFPA 70), Article 690. (Reference [3] only links the NFPA home page; the Article 690 wording is not verified here.)
Exceptions: small portable or vehicle systems (vans, boats, camping kits) often run floating, with metal parts bonded to the chassis instead. Fully floating systems (IT systems) have their own special requirements [7] . Follow the manufacturer’s instructions.
What earthing does
- Protective earth (PE) and bonding. All exposed metal (panel frames, rails, inverter chassis, enclosures) is connected so a fault has a defined path and breakers or RCDs trip.
- AC reference point. The inverter creates its own mains supply. Bonding neutral to earth at one point makes the system behave like normal mains (TN-S) and lets RCDs work [7] .
- Lightning and surge protection. It gives surge protectors (SPDs) somewhere to divert spikes. IEC 62305 recommends a single integrated earth termination system shared by lightning protection, power and telecoms [27] .
3. Earthing layout for this system
3.1 Electrode and main earthing terminal (MET)
- Run the earthing conductor from the rods to an earth bar (MET) in the distribution board.
- If the building has a foundation earth or another existing electrode, connect to it. Never keep two separate earths [27] .
- Connect to the MET:
- the inverter PE/ground terminal
- PE of all AC circuits
- panel frames and mounting rails (≥ 6 mm² Cu (common practice))
- the earth terminals of all SPDs
3.2 Neutral–earth (N–PE) bond — the critical point
Many low-cost all-in-one inverters of the Axpert / MPP Solar / WKS type do not bond N to PE when running from battery. Users of these units commonly measure roughly 100–110 V between neutral and earth in battery mode, and 0 V in bypass (grid) mode [5] . Others see the same pattern with a socket tester: earth is missing only when running from battery [9] . Without a bond, downstream RCDs are ineffective [7] . Some newer versions do bond internally with a relay [4] [6] , so measure rather than assume. (That the EASUN unit shares this platform is an inference from its specifications; the test below settles it.)
Test: disconnect the AC input, run from battery, and measure N → PE at the output. Users recommend measuring in both line mode and battery mode [5] .
| Reading | Meaning | Action |
|---|---|---|
| ~0 V | Already bonded internally | Do nothing |
| ~100 V (about half the output voltage) | Floating neutral | Add a bond (see below) |
Fix:
- Pure off-grid (nothing on AC input): add a single N–PE link in the distribution board after the inverter output → TN-S system [5] .
- Generator or grid on AC input: a permanent link would create a second bond in bypass mode, which must be avoided [6]
. Use a switching solution that bonds N–PE only in battery mode:
- a relay or contactor whose normally-closed contact makes the bond when the AC input drops out [4] [6] , or
- a ready-made “grounding box” that does this automatically [8] .
- Caveat: a relay driven by the presence of AC input voltage fails if the inverter runs from solar/battery while the input is still live (e.g. solar- or battery-priority modes). The neutral then floats with no bond in place [4] . The bond must follow the inverter’s actual operating mode, not just whether the input has voltage.
Where the bond goes: make it between the inverter output and the first RCD, never on the load side of an RCD. A bond downstream of an RCD lets neutral current return through the PE conductor, bypassing the RCD, which causes nuisance tripping and defeats its protection (engineering principle; not from a cited source).
Only one N–PE bond in the whole system [6] .
3.3 AC protection
- 30 mA RCD on output circuits. Type A is the usual minimum: HD 60364-5-53 describes the RCD types, and Danish rules, for example, do not allow Type AC in dwellings [37] . Check the inverter manual too; some inverters specify a particular RCD type.
- In an off-grid system the RCD is essential, not just an extra. A small inverter can only supply a limited fault current, often only a few times its rated current and only briefly, so an ordinary circuit breaker may not trip fast enough on an earth fault. The RCD is what reliably disconnects. Choose breaker sizes with the inverter’s maximum output current in mind (engineering principle; check the inverter’s short-circuit behaviour in its manual).
- AC Type 2 SPD in the distribution board [13] [16] .
3.4 DC side — what NOT to earth
- IEC 60364-7-712 does not permit protective earthing of any PV array conductor, and requires that the PV module and inverter manufacturers’ requirements be taken into account when choosing the earthing arrangement [2] . (Note: [2] summarizes the 2017 edition. Whether the 2025 edition [1] words this differently is not checked.)
- Do not earth PV+ / PV− or the battery negative unless the manual explicitly says to. Installers warn that on a non-isolated inverter, bonding a DC conductor can short it and destroy the inverter [38] .
- Earth only metal frames and the chassis.
- For up to 450 V DC from the roof, fit:
- a DC isolator rated for that voltage
- string sizing with cold weather in mind: panel open-circuit voltage (Voc) rises as temperature falls, so a string that is comfortably below 450 V on a mild day can exceed it on a cold, sunny winter morning and damage the inverter. Calculate the string’s Voc at the lowest expected temperature using the panel datasheet’s temperature coefficient (engineering principle; see the panel and inverter datasheets)
- a PV-rated DC SPD (IEC 61643-31) near the inverter, with Ucpv above the worst-case (cold-weather) string voltage [15] [39] , earthed to the MET
- a second DC SPD at the array end if the cable run is 10 m or longer (IEC 61643-32 guidance) [13] [14]
3.5 Roof specifics
- Bond every rail section. Use proper earthing clamps or WEEB-type washers for anodized aluminium frames (common practice).
- Avoid direct copper-to-aluminium contact outdoors; it corrodes. Use clamps rated for the metal pair, or tinned/bimetallic lugs (common practice).
- If the building has an external lightning protection system (LPS), the required SPD types change (Type 1+2 instead of Type 2), and the array must either keep a separation distance from the LPS or be bonded to it [16] [26] . Have an electrician design this.
3.6 Battery side (not earthing, but critical)
At 12 V and 2.2 kW, battery current is well over 200 A: 2200 W ÷ ~11 V ≈ 200 A, plus inverter losses (at ~90% efficiency about 220 A), and more during motor start-up surges. Use thick cables (often ≥ 50 mm² depending on length) and properly rated protection right at the battery (engineering estimate / common practice). A single fuse at the battery positive is the convention for negative-grounded systems; an unearthed battery like this one is better served by double-pole protection. Section 4 covers where the fuses or breakers go on an unearthed battery.
3.7 Commissioning checks
- N–PE voltage in battery mode: ~0 V [5]
- Earth electrode resistance test (fall-of-potential) [20]
- RCD test button, plus ideally a proper RCD trip-time test against the maximum operating times [35]
4. Battery fusing and disconnection
The battery here is unearthed (floating): neither pole is connected to earth, in line with section 3.4. With well over 200 A flowing at 12 V (section 3.6), where the fuses or breakers go on the battery cables matters. The system first had a separate fuse on each battery cable, and on overload the negative fuse always blew first. This section explains why, and why both fuses were replaced with a double-pole DC breaker.
4.1 Polarity and “hot”
| Term | Meaning |
|---|---|
| Positive (+) | Battery + terminal, normally the red cable |
| Negative (−) | Battery − terminal, normally the black cable |
- Colors are a convention, not a guarantee. Check with a multimeter (DC volts, red probe on the cable you think is +: a reading of about +12–14 V confirms it), and trust the terminal markings over the cable color.
- PV cables are often both black. Polarity is marked on the cable or connector.
- Don’t confuse these with AC colors. On the 230 V side in Europe, brown is live, blue is neutral and green/yellow is protective earth. In older installations, black can be a live AC conductor (common practice).
Current flows in a loop. During discharge, electrons leave the negative terminal, go through the external circuit and return to the positive; conventional current is defined the opposite way, and both describe the same thing. The same current flows through both cables at the same time, so a fuse on either cable sees exactly the same current.
“Hot” means voltage relative to a reference (usually earth), not electron direction. The hot conductor is the one not connected to the reference (engineering principle):
- negative-grounded systems (cars, boats, most 12/24 V systems): the positive is hot
- positive-grounded systems (classic −48 V telecom): the negative is hot
- floating systems like this one: neither pole is hot relative to earth until a fault connects one of them to it; the two poles are still 12–14 V apart.
4.2 Why the negative side runs hotter
The negative fuse did not blow first because more current flowed through it — it is the same current. Overload tripping is thermal, and fuses have manufacturing tolerances, so the one that runs hotter goes first: a loose or corroded holder, a warmer location, or a slightly different fuse type (engineering principle).
The negative cable runs hotter too. During charging, the black cable between the inverter and the DC breaker gets noticeably warmer than the red cable next to it. Heat in a cable is . With the same current in both, the hotter cable has more resistance somewhere, cools less well, or picks up heat from something it is connected to (engineering principle). Likely causes, roughly in order:
- The inverter’s internal current measurement. Many all-in-one inverters measure battery current with a shunt resistor or a PCB trace in the negative path, just behind the terminal. It gets warm under heavy current, and the copper conducts that heat into the black cable. The red cable has no such heat source. This is a common design, but not confirmed for this inverter (engineering estimate).
- The termination at the inverter. A loose screw, a lug too large for the stud, or a poor crimp adds contact resistance. At 200 A, 1 mΩ of contact resistance gives 40 W in one spot.
- The termination at the breaker, or the negative pole’s internal contact.
- The cable itself: a smaller cross-section, copper-clad aluminium (CCA) instead of copper, or a longer run than the red cable.
Alternate paths (section 4.4) cannot explain this. A second path on the negative side would take current away from the black cable and make it cooler, not hotter.
Finding the cause (engineering principle):
- After a few minutes of steady charging, find where the cable is hottest, for example with an IR thermometer. Hottest at the inverter end points to cause 1 or 2, hottest at the breaker end to cause 3, and evenly warm along its length to cause 4.
- Under the same steady current, measure the millivolt drop on the black and the red cable side by side: terminal metal to lug, lug barrel to bare conductor (the crimp), lug to lug along the cable, and across the breaker pole. The drop is , so it scales with the current actually flowing: a good joint drops only a few mV at 200 A, and proportionally less at a lower charging current (about 1 mV at 50 A). A joint well above that is the culprit. Use a meter with a 200 mV range and 0.1 mV resolution; a 2 V range cannot resolve these values.
- If no joint stands out and both cables drop the same along their length, but the black is still hotter at the inverter end, the heat comes from inside the inverter (cause 1). That is acceptable as long as the terminal stays below the temperature rating of the cable insulation, typically 70–90 °C.
Measuring safely under load (engineering principle). Measuring with current flowing is the point of this test, and it is safe in itself. In DC volts mode the meter has an input impedance of about 10 MΩ and draws only microamps, so the 200 A stays in the copper. The hazards come from the battery behind the cables, which can deliver thousands of amps into a short circuit:
- Plug the red lead into the V jack and select DC mV or DC V. A lead left in the 10 A jack turns the probes into a short circuit. Across + and −, that means an arc and molten metal.
- Keep both probes on the same cable. Every reading in this test is taken along one cable or across one breaker pole, so never place one probe on the positive side and the other on the negative side. If the meter is in the wrong mode or a probe slips, that is a short circuit across the battery. The same applies to the positive side and earthed metal: an accidental connection on the negative side (section 4.4) can turn that into a short circuit and unleash hell.
- Use probes with insulated tips (or clip-on leads), and take off rings and watches.
- Don’t touch the joint you are testing. It may be hot, which is why you are measuring it.
- Only probe copper that is already exposed. Do not cut into the insulation to reach the conductor.
- If the breaker is open, the meter reads the full battery voltage across its pole. That is harmless, but it does not indicate a bad contact.
On a 48 V system (engineering principle), the same test applies, but the risks change:
- The same power needs a quarter of the current: about 50 A instead of 200 A for 2.2 kW. The millivolt drops are four times smaller, and joint heating () is sixteen times lower, so a hot cable like the one described here is much rarer.
- A nominal 48 V system reaches about 58 V while charging (58.4 V for a 16-cell LiFePO4 bank), and lead-acid can exceed 60 V during equalization. This is at or above the touch-voltage limit for SELV in IEC 61140: 60 V DC in dry locations without large contact areas, and 15 V DC in all other conditions [49] . A shock is unlikely to be lethal, but a reflex jerk can slip a probe into a short circuit. Treat the terminals as live.
- Arcs are the bigger difference. At 12 V, a DC arc barely sustains itself and usually goes out as the gap opens. At 48–58 V, an arc from a slipped probe or a lug pulled off under load can sustain itself and keep melting metal.
- Fuses and breakers must have a DC voltage rating above the maximum charge voltage. Many automotive-style fuses are rated for only 32 V DC, which is not enough (common practice).
4.3 The traditional rule: fuse the positive
Common guidance is a single fuse on the positive cable, close to the battery:
- “With DC circuits, the overcurrent protection is always placed in the positive side.” ABYC E-11 (a marine standard) requires the fuse within 7 inches (175 mm) of the battery connection, with longer limits for sheathed cables [42] .
- “The bank fuse is there to protect the wire!” Fit it within 7 wire inches of the bank’s positive terminal; the European ISO rule is 200 mm. With large banks, the fuse’s interrupt (AIC) rating matters [43] .
- In negative-grounded vehicles the chassis is the return path, so a positive wire touching metal bypasses any fuse on the negative. A fuse close to the battery also protects more of the wiring [44] .
- Victron’s Wiring Unlimited states: “The fuse is placed in the positive cable.” [45] [46]
This applies only partly to a floating system. The “positive shorts to the chassis” argument assumes a grounded negative. In a properly floating system, a positive cable touching earthed metal does nothing on its own. Unintended connections on the negative side can still create such a path, though (section 4.4).
Reasons for the positive fuse that do apply here:
- It protects against the fault every system can have: the two cables shorting together (a crushed cable, a dropped tool).
- When it blows, the cable downstream is dead, which is safer to work on.
- It avoids the negative-side alternate-path problem (section 4.4).
- Convention: anyone working on the system later expects it.
4.4 The negative-side alternate-path problem
The battery negative is often connected to the inverter by more than the main black cable:
- a USB or RS232 cable to a laptop or Raspberry Pi
- BMS or other communication cables (CAN, VE.Bus, etc.)
- a separate charge controller or DC-DC converter sharing the negative
- internal connections in transformerless inverters, where battery − is related to PV − and the AC side
If only the negative fuse opens while the system is loaded, the loop is not necessarily broken: the return current can take one of those thin paths instead. That wire was never meant to carry 200 A, so it melts, or the electronics it connects are damaged.
The positive is the safer side to open. Almost all incidental connections are on the negative side. The positive side normally has only the one fused cable, so opening it really breaks the loop.
Victron documents this. Quoting Wiring Unlimited (p. 35), breaking the negative while a data cable still connects devices “will cause a current in the negative signal of the data cable”, and “this current can damage the inverter/charger’s communication chip”. Victron’s example is paralleled inverters [47] .
If nothing else shares the battery negative, a blown negative fuse simply stops the system, the same as a blown positive fuse.
4.5 Unearthed batteries: protect both poles
The “positive only” rule comes from systems with a grounded negative. For an unearthed battery, stricter practice protects and isolates both poles:
- Victron staff explain that some of their energy-storage diagrams fuse the negative too, because such batteries often need a double-pole disconnect, and the battery maker (BYD in that case) requires it. Breaking the negative alone can damage equipment that is not galvanically isolated, so a common negative is preferred [46] .
- Participants on a South African forum quote their local installation rules: if neither battery terminal is earthed (typical with these inverters), both poles must be fused and both must have a disconnect. If one pole is earthed, that pole must not be fused or disconnected [48] .
Two separate fuses are not the ideal answer. They blow independently, which is exactly what happened here: the negative opened alone, and that is the alternate-path situation from section 4.4.
4.6 The chosen solution: a double-pole DC breaker
The separate fuses were replaced with a 2-pole DC breaker:
- Both poles are mechanically linked, so a fault on either side opens both together.
- The negative can no longer open on its own.
- The battery can be fully isolated for maintenance.
Check on its label or datasheet (engineering principle where not cited):
- DC-rated at or above the battery voltage (e.g. “DC 125 V”), not only AC-rated. ABYC requires a DC voltage rating of not less than the nominal system voltage [42] .
- Non-polarized, or approved for current in both directions. Many DC breakers are polarized (+/− or an arrow on the terminals) and are only guaranteed to interrupt current in one direction. A battery breaker carries current both ways: discharge and charge.
- Breaking capacity above the battery’s short-circuit current. A 12 V bank, especially lithium, can deliver several thousand amps into a short. A breaker with too low a breaking capacity can arc over and weld shut; ABYC sets the required interrupt capacity by battery size, e.g. 1500–5000 A for a 12 V main breaker [42] . The usual fix is a class-T fuse at the battery positive ahead of the breaker: the fuse handles dead shorts, the breaker handles overloads and isolation. Fuses need an adequate interrupt rating too [43] .
- Current rating: about 220 A continuous plus inverter surges without nuisance tripping, while staying below the battery cables’ rating. At this current it will be a DC-rated 2-pole MCCB (moulded-case circuit breaker), not a small DIN-rail unit.
Alternatives:
- a fuse switch-disconnector that opens both poles when a fuse blows
- a positive fuse plus a 2-pole isolator switch: a fault opens only the positive, which is the safe side, and the switch isolates both poles for maintenance
Distance from the battery: as close as practical. Marine rules for unsheathed cable are within 7 in (175 mm) under ABYC [42] and within 200 mm under the European ISO rule [43] . Don’t put fuses, breakers or switches inside a battery compartment, because of corrosion and possible explosive gases [42] .
5. Terms explained
RCD (Residual Current Device)
A safety switch that compares the current on live and neutral. If they differ (current leaking to earth, e.g. through a person), it trips: within 300 ms at its rated leakage current, and within 40 ms at five times that [35] . A 30 mA RCD trips at 30 mA of leakage, low enough to prevent a fatal shock.
- A circuit breaker trips on overload or short circuit and protects the wiring.
- An RCD protects people.
- An RCBO combines both.
- An RCD needs the N–PE bond to work [7] .
SPD (Surge Protection Device)
Does nothing in normal operation. During a voltage spike (nearby lightning, switching) it briefly conducts and diverts the spike to earth. Long DC cables from the array act like antennas for surges from nearby strikes [39] .
- AC SPD: in the AC distribution board; protects the inverter output and house circuits. Standard: IEC 61643-11 [15] .
- DC SPD: on the PV cables before the inverter input. It must be PV/DC-rated (IEC 61643-31); using an AC SPD on the PV DC side is a common mistake [15] .
- Type 2 is the usual class for buildings without external lightning protection [16] [39] .
All of these devices are DIN-rail modules.
6. How earth electrode resistance works
Surface area vs. length
The resistance is really that of the soil around the electrode. Rod surface area is a weak lever; length (depth) is a strong one.
- Doubling the length reduces resistance by roughly 40%; doubling the diameter by only ~10% [18] . (Fluke says “up to 40%”; the formula below gives ~44% for the short-rod example, so treat both as approximate.)
- Rod diameter has no significant effect on resistance to ground [17] .
Dwight’s formula for a single rod (published 1936) [17] :
= soil resistivity (Ω·m), = rod length (m), = rod radius (m). Equivalent form with diameter : . It assumes uniform soil [17] .
Worked examples at ρ = 100 Ω·m (engineering estimate, computed from the formula):
| Electrode | Resistance |
|---|---|
| 1.5 m rod, 16 mm diameter | ~60 Ω |
| 1.5 m rod, 32 mm diameter (2× surface area) | ~52 Ω (−12%) |
| 3 m rod, 16 mm diameter (2× surface area) | ~34 Ω (−44%) |
A thicker rod is mainly useful for strength when driving, not for lower resistance.
What actually lowers resistance
- Going deeper. Depth is the main factor for an earth rod [11] . Rod sections in dry or frozen layers add resistance [17] [26] .
- More rods in parallel. Space them at least their own length apart, preferably twice [19] . The first added rod gives the biggest reduction [17] . Two well-spaced rods give about 55–60% of one rod’s value, not 50% (engineering estimate).
- Soil type. Gravel, sand and stone have the highest resistivity [19] .
- Horizontal strip or ring electrodes where rock prevents deep driving [26] .
- Ground-enhancing backfill or chemical treatment in high-resistivity soil [17] .
7. Analysis of the existing system (28 Ω)
Expected vs. measured (engineering estimate)
Rough estimate using Dwight’s formula at average soil (100 Ω·m), 16 mm rods:
- one 2 m rod ≈ 47 Ω
- seven 2 m rods at 3 m spacing ≈ 10 Ω (not 47/7, because their zones overlap)
- the 6 m rod alone ≈ 19 Ω
- everything combined ≈ 6–7 Ω
The measured 28 Ω is about 4× higher, which points to soil resistivity around 400 Ω·m or more, consistent with sand, gravel or stony ground [19] . This treats the soil as uniform. In reality the dry top layer is probably much worse than this average and the deeper soil better, which is exactly what a Wenner survey would reveal.
Why: a very dry summer
The measurement was taken in a very dry summer. Earth resistance changes with soil moisture, temperature and season [12] , and an electrode installed in moderate weather can become ineffective in a different season [11] .
- 28 Ω is likely close to the summer worst case, not the typical value.
- Frozen ground can be as bad or worse. If winters freeze the topsoil, resistance rises then too: soil near 0 °C can be about four times more resistive than at room temperature, and frozen soil far more [19] . An electrode can become ineffective in winter [11] . So the true annual worst case may be a hard frost, not a drought, and a winter measurement is worth taking as well.
- The 6 m rod is the stable part: most of its length sits below both the drying and the freezing layers.
- Lightning-protection practice is to test in dry conditions, when resistivity peaks [36] , so 28 Ω is a sound figure to judge against, unless a winter measurement turns out higher, in which case use that.
- Recommendation: re-measure in a wet period using the same stake positions. Recording moisture conditions alongside the reading is standard practice [25] .
Is 28 Ω a problem?
- Shock protection: no. The touch-voltage rule is . For a 30 mA RCD that allows up to [10] [11] . In practice, electrodes above ~200 Ω are considered unstable [12] , and 28 Ω is far below both limits. In TN-S with the N–PE bond at the inverter, fault current returns mainly through the PE wire rather than the soil.
- SPDs: usually fine. Short connections and good bonding matter a great deal.
- External lightning protection system: IEC 62305-3 recommends an earth-termination resistance below 10 Ω [26] [27] . This is the only case where improvement is really worth pursuing.
8. Getting below 10 Ω in dry periods
Only worth it if there is (or will be) an external lightning protection system, or the site is very exposed. The 10 Ω figure is the IEC 62305-3 recommendation [26] [27] .
Measure first
- On the same day, measure the 6 m rod alone (disconnected), then the seven 2 m rods alone.
- Illustrative example (engineering estimate, not real numbers): if, in dry conditions, the 6 m rod alone measured about 50–55 Ω and the seven 2 m rods together also about 50–55 Ω, the combination would come to roughly 28 Ω. (Two equal resistances in parallel give half the value, about 25–28 Ω, slightly more because the two groups still share some soil.) In uniform soil the seven short rods would measure lower than the 6 m rod (section 7), but dry topsoil hurts the short rods most, so in a drought the two can come out similar.
- Each extra 6 m rod of about 50 Ω adds roughly 0.016–0.02 S of conductance once some mutual coupling is allowed for. Getting from about 28 Ω (≈ 0.036 S) to 10 Ω (0.1 S) would then need roughly 0.064 S ÷ 0.016–0.02 S ≈ 3–4 more well-spaced 6 m rods; plan for 4, or 5 if coupling turns out worse. Your own measurements will give the real figure.
If going ahead
- Space deep rods about 2× their length apart (~12 m), at least 1× (6 m) [19] .
- Run a Wenner test at wide spacings (8–16 m) first. If deep soil is no better, more 6 m rods will disappoint; a ring electrode or backfill may work better [26] .
- Consider going deeper instead of wider. Depth is the main factor [11] , and sectional coupled rods can reach 9–12 m.
- Bond everything to one point with corrosion-resistant clamps, and keep connections accessible in inspection pits. Corrosion resistance of connections is vital for a lasting earth [27] .
9. Measuring
Fall-of-potential (3-pole) — measures the electrode
Defined in IEEE Std 81 [20] [28] .
- Place the current stake far away. Rules of thumb range from at least 5× [20] to 10× [21] the largest dimension of the electrode system (for a grid, use the diagonal; for rods in a line, the total length [21] ). For a system spread over 20–30 m that means roughly 100–150 m (5× rule) up to 200–300 m (10× rule).
- Place the potential stake at 62% of that distance (61.8%, IEEE 81 Annex C) [20] .
- Caveat for multi-rod systems: for systems of several electrodes, the 62% spacing may no longer apply directly [41] . With a large, spread-out system like this one, plotting a full curve (readings at many potential-stake positions, looking for a flat section) is more reliable than a single 62% reading.
- Validity check: keep the current stake fixed and measure with the potential stake at 52%, 62% and 72% [22]
.
- Readings agree within 5–10% → valid
- Readings differ noticeably → stakes too close. Overlapping resistance zones remove the plateau and produce artificially low readings [22] .
- Run leads away from buried pipes, cables and fences.
Methods that don’t work here:
- Clamp-on earth tester on an isolated system: clamp-on testing has severe limitations, and simply clamping onto any point of an earthing system is not effective testing [22] [28] .
- Multimeter between rods: doesn’t measure earth resistance at all.
Wenner 4-pin test — measures the soil itself
Defined by Frank Wenner in 1915 [24] ; standardized in ASTM G57 [40] and also described in IEEE Std 81 (not confirmed by the cited sources).
C1 ---- a ---- P1 ---- a ---- P2 ---- a ---- C2
- The tester injects current between the outer stakes and measures voltage between the inner stakes, giving a reading R [24] .
- Stakes go in shallow: no deeper than a/20 [19] [25] .
- Soil resistivity: [23]
[24]
.
- Example: a = 4 m, R = 15 Ω → ρ ≈ 377 Ω·m
- The result is the average resistivity down to a depth roughly equal to the spacing a [23] [24] .
- Repeat at several spacings (e.g. 1, 2, 4, 8, 16 m) and compare results to build a soil model [23] .
- A 4-terminal tester is required [24] .
| Result as spacing grows | Meaning | Best option |
|---|---|---|
| ρ falls | Deeper soil conducts better | Longer or deeper rods |
| ρ stays high or rises | Deep layers no better (sand, gravel, rock) | Horizontal ring or strip, backfill |
| ρ low at small spacing, rising with depth | Good soil near the surface | Shallow horizontal electrodes [26] |
Tips:
- Test away from existing rods, pipes, cables and fences. Keep at least the maximum spacing a from them [25] .
- Measure along two lines at right angles (common practice).
- Record temperature and soil moisture [25] .
- Use proper AC testers, not DC improvisations; the method uses AC current [40] .
10. Choosing a tester
Key requirement: 4 terminals and explicit 4-pole / Wenner / soil resistivity support [24] .
Branded options
| Model | Notes |
|---|---|
| Sonel MRU-11 | Budget; 3-pole, 4-wire and Wenner [30] |
| Kyoritsu KEW 4106 | Mid-range; calculates ρ from the stake spacing; four test frequencies; warns about high stake resistance and interference [29] |
| Megger DET4TC2 | Professional standard; 4-pole [24] . DET4TCR2 kit with clamps listed at ~$4,400 in the US [31] |
Renting is a good option for a one-off survey; for example, the Megger DET4 is offered for hire [32] .
Buying on AliExpress
Avoid (no Wenner capability):
- UNI-T UT522 / UT521: simple 2-wire and precise 3-wire only [34]
- Kyoritsu 4105A clones: 3-wire only (based on the original model’s specifications)
- Clamp-type earth testers: limitations above [22] [28]
Look for: “4-wire / 4-pole” and “soil resistivity / Wenner” in the listing. Example: ETCR3000B, which does 2-, 3- and 4-wire earth resistance plus Wenner soil resistivity, and lists IEC 61557-5 [33] .
Before ordering, check:
- Four stakes and four leads. Kits often include only two stakes.
- Lead length. For 16 m spacing you need about 24 m each way from the middle.
- AC test signal at a frequency other than 50 Hz, to reject interference from your own 230 V system. The Kyoritsu 4106, for example, uses 94–128 Hz [29] .
Expectations: budget testers are fine for comparisons and ballpark values (engineering judgement). Sanity check: re-measure the existing system with the 3-pole method in similar weather and see whether you get close to 28 Ω.
11. Next steps
- Measure N → PE in battery mode and add the bond if the neutral floats [5] .
- Confirm RCDs and SPDs (AC and PV-rated DC) are fitted, and that PV± and battery negative are not earthed [2] [15] .
- Check the battery breaker against the four points in section 4.6. If its breaking capacity is too low for the battery, add a class-T fuse at the battery positive.
- Check the national rules and the battery manufacturer’s manual for double-pole requirements [46] [48] . Keep communication cables in mind: they are the likely alternate paths if the negative is ever disconnected under load [47] .
- Find the source of the extra heat in the black cable between the inverter and the breaker: locate the hottest point during steady charging, then measure the millivolt drops on both cables (section 4.2).
- Get a 4-pole tester (or rent one).
- Re-check the 28 Ω reading with the current stake much farther out, plotting a curve of readings rather than relying on a single 62% point, since the 62% rule doesn’t apply directly to a multi-rod system [41] . The 52/62/72% check [22] is a quick first test.
- Measure the 6 m rod alone and the 2 m rods alone.
- Run a Wenner survey at 1–16 m spacings [23] .
- Re-measure in a wet season and, if the ground freezes, in a hard frost, using the same stake positions.
- Decide on extra electrodes only if a lightning protection system makes < 10 Ω necessary [26] .
References
Standards (official listings and previews; full texts are paywalled)
- [1] IEC 60364-7-712:2025 — PV power supply installations (ANSI webstore listing). https://webstore.ansi.org/standards/iec/iec60364712eden2025
- [2] Summary of IEC 60364-7-712:2017, including earthing arrangements of PV arrays (LSP). https://lsp.global/electrical-installations-for-photovoltaic-solar-power-system/
- [3] NFPA 70 — National Electrical Code (NFPA). https://www.nfpa.org
- [14] IEC 61643-32:2017 — SPDs on the DC side of PV installations, selection and application (VDE preview). https://www.vde-verlag.de/iec-normen/preview-pdf/info_iec61643-32{ed1.0}b.pdf
Earthing, RCD and touch voltage
- [10] TT system — Principle, RCD sensitivity vs. maximum earth electrode resistance (Electrical Installation Guide, Schneider Electric). https://www.electrical-installation.org/enwiki/TT_system_-_Principle
- [35] TT system — Practical aspects, maximum operating time of RCDs (Electrical Installation Guide, Schneider Electric). https://www.electrical-installation.org/enwiki/TT_system_-_Practical_aspects
- [11] TT earthing considerations (IET Wiring Matters, Sept 2021). https://electrical.theiet.org/wiring-matters/years/2021/87-september-2021/tt-earthing-considerations/
- [12] Measuring earth electrode resistance — 3-point method and the TT rule of thumb. https://nen.sulerr.com/en/guides/practical/aardingsweerstand-meting
- [17] How to improve resistance to ground — Dwight’s formula (EEPower). https://eepower.com/technical-articles/how-to-improve-resistance-to-ground/
- [18] Four methods to conduct earth ground testing (Fluke). https://fluke.com/en-in/learn/blog/electrical/dont-forget-the-grounding-system
- [19] Understanding soil resistivity testing (AEMC application note). https://www.globaltestsupply.com/content/aemc-understanding-soil-resistivity-testing.html
- [37] Fault protection of inverters by automatic disconnection (Danish Safety Technology Authority, in Danish). https://sik.dk/sites/default/files/2024-08/fejlbeskyttelse_af_invertere_ved_automatisk_afbrydelse_i_tilfaelde_af_fejl.pdf
- [49] ES1, LPS and SELV voltage and source requirements summary, including IEC 61140 subclause 5.2.6 (IEEE 802.3, David Law, 2021, PDF). https://www.ieee802.org/3/ad_hoc/PDCC/public/2021/ES1_LPS_SELV_1_0821.pdf
Inverter neutral–earth bonding (field experience)
- [4] Axpert floating neutral (Power Forum). https://powerforum.co.za/topic/6689-axpert-floating-neutral/
- [5] Causes of high voltage neutral–ground? (Axpert) (Power Forum). https://powerforum.co.za/topic/3003-causes-of-high-voltage-neutral-ground-axpert/
- [6] Inverter neutral–earth bonding (Power Forum). https://powerforum.co.za/topic/19861-inverter-neutral-earth-bonding/page/6/
- [7] Epever UP5000 and floating neutral (Electricians Forum). https://electricianforum.co.uk/threads/epever-up5000-hm8042-and-floating-neutral.57263/latest
- [8] Ground box for WKS inverter (Wattuneed). https://oldp.wattuneed.com/en/inverters-chargers/3999-ground-box-for-inverter-wks-0712971136144.html
- [9] Hybrid inverter grounding floating (Solar-Electric forum). https://forum.solar-electric.com/discussion/354764/hybrid-inverter-grounding-floating
- [38] Battery grounding (Mike Holt forum). https://forums.mikeholt.com/goto/post?id=2939444
Surge protection
- [13] Selection guide for PV surge protection (Phoenix Contact). https://assets.phoenixcontact.com/file/23ad0239-be5d-40a2-bfb5-8a28fe6602a0/media/original
- [15] DC SPD for solar: selection, wiring diagram and installation guide (VIOX). https://viox.com/how-to-choose-the-right-spd-for-your-solar-power-system/
- [16] How to choose the correct SPDs for a PV system (Lovato Electric). https://datasheet.lovatoelectric.com/DOWNLOAD/Technical/TechInstructions/18.%20SCARICATORI%20DI%20SOVRATENSIONE/PD194GB10_24.pdf
- [39] Surge protection for solar panels — selection guide (LSP). https://lsp.global/surge-protection-for-solar-panels/
Lightning protection earthing
- [26] DEHN Lightning Protection Guide, earth-termination systems for PV. https://resources.ipd.com.au/Flipbook/35_DS702_E_2014_Lightning_Protection_Guide/files/basic-html/page377.html
- [27] Furse guide to BS EN/IEC 62305-3, earth termination system. https://storage.electrika.com/flips/8300-furse-15-a/files/assets/basic-html/page-312.html
- [36] BS EN IEC 62305-3 design, inspection and maintenance guide. https://skytreescientific.ai/?p=9865
Measurement methods
- [20] Earth resistance measurement and the 62% rule (Metrel). https://www.metrel.si/en/solutions/power-distribution/earth-resistance-measurement-and-62-rule/
- [21] An introduction to the fall-of-potential method (EEPower). https://eepower.com/technical-articles/an-introduction-to-the-fall-of-potential-method/
- [22] Ground resistance testing: fall-of-potential 62% rule and clamp-on methods. https://open-exam-prep.com/study-guides/pe-electrical-power/measurement-instrumentation/ground-resistance-testing
- [23] Measuring soil resistivity with the Wenner method (EEPower). https://eepower.com/technical-articles/measuring-soil-resistivity-with-the-wenner-method/
- [24] Let’s get technical: soil resistivity testing (Megger). https://www.megger.com/en/blog/august-2014/let-s-get-technical-soil-resistivity-testing
- [25] Determining soil resistivity for grounding system design (Electrical Engineering Portal). https://electrical-engineering-portal.com/determining-the-soil-resistivity-to-design-a-good-substation-grounding-system
- [28] Ground testing techniques (EC&M). https://www.ecmweb.com/basics/bonding-grounding/article/20885263/ground-testing-techniques
- [40] Soil resistivity testing: Wenner 4-pin method (ASTM G57). https://open-exam-prep.com/study-guides/ampp-cp-1-tester/field-survey-techniques/wenner-4-pin-method
- [41] Fluke “Earth Ground Resistance — Principles” booklet (copy hosted on Scribd), section on the 62% method and multiple-electrode systems. https://www.scribd.com/doc/153710317/Ground-Principles
Battery fusing
- [42] DC circuit protection (Blue Sea Systems). https://www.bluesea.com/support/articles/Circuit_Protection/98/DC_Circuit_Protection
- [43] Battery banks & over-current protection (MarineHowTo). https://marinehowto.com/?p=17412
- [44] Why is the fuse on the positive side? (Bob Is The Oil Guy forum). https://bobistheoilguy.com/forums/threads/why-is-the-fuse-on-the-positive-side.390224/latest
- [45] Wiring Unlimited, free download (Victron Energy). https://www.victronenergy.com/blog/2020/wiring-unlimited
- [46] Fuses on negative terminals (Victron Community archive). https://communityarchive.victronenergy.com/questions/232854/fuses-on-negative-terminals.html
- [47] 3-phase or parallel systems: breaking the negative connection (Victron Community). https://community.victronenergy.com/t/3-phase-or-parallel-systems-breaking-the-negative-connection-potential-workaround/11338
- [48] Fusing negative battery terminals — any benefit? (Power Forum). https://powerforum.co.za/topic/20177-fusing-negative-battery-terminals-any-benefit/
Test equipment
- [29] Kyoritsu KEW 4106 earth resistance and resistivity tester. https://techno.my/products/kyoritsu-4106-earth-tester-resistivity-tester
- [30] Sonel MRU-11 earth resistance and soil resistivity meter. https://sonel.pl/en/product/earth-resistance-and-soil-resistivity-meter-sonel-mru-11
- [31] Megger DET4TCR2 + clamps (TestEquity listing). https://www.testequity.com/brand/Megger/category/Data-Acquisition-and-Meters/Hipot-Electrical-Safety/Earth-Ground-Tester/32078-1-DET4TCR2-Clamps
- [32] Megger DET4 rental (TMG Test Equipment). https://www.tmgtestequipment.com.au/Item/Megger-DET4-Auto-Earth-Tester
- [33] ETCR3000B earth resistance and soil resistivity tester (Newegg listing). https://www.newegg.com/global/jp-en/etcr3000b-test-equipment/p/2YK-03HK-00020
- [34] UNI-T UT520 series comparison (PDF). https://gotronik.pl/images/ut52x_porownanie.pdf
Have questions or feedback? Get in touch!
Recent posts
- Arsenic in Irrigation and Drinking Water — What the Research Actually Says September 18, 2026
- Automatically deleting Media Files on Django Model Updates November 21, 2025
- Configuration for Aider August 27, 2025
- Mail quota check in Thunderbird August 27, 2025